As much as we would like to, we are unable to photograph every project that we undertake throughout barrow in furness, however below are a few examples of some of the jobs DOC builders northwest have undertaken in the past few years.
 |
House on headlands rise built whole house , excessive work on foundations (roughly 2 houses down) 4 months to build. |
 |
Same as above but 3 months to build, same set-up as above. |
 |
Headland rise garage built approximately 3 weeks with side door double skinned cavity wall construction. |
 |
Leisure centre , contracted for brickwork from main contractor did all brickwork and block work on the site. Virtually from start to competition. |
 |
Another example of the leisure centre. |
 |
Station cottage – Dalton . Total refurbishment. Took roof off every wall out and all the floors up and then built double extension on the side and re plastered everything. |
 |
Station cottage pic 2 |
 |
Station cottage pic 3 |
 |
Extension done at rustland drive in Dalton. Double story extension with garage. |
 |
Rustland drive again further down. Double storey extension with garage and additional out houses for storage. |
 |
Rustland drive again further down. Double storey extension with garage and additional out houses for storage. Picture 2 |
 |
Total build from scratch 6 months for 2 houses in the same area of a similar size. |
 |
Total build from scratch 6 months for 2 houses in the same area of a similar size. Picture 2 |
 |
The Headland - Askam, Corner property. Full build used same plans as the above property. |
 |
As above - different angle |
 |
As above - different angle |
 |
Sandy lane - Askam next to the rugby ground. 2 Full extensions on 1 on each end of the property, also a big conservatory at the back and the boundary walls at front of property. all done by DOC builders Northwest Ltd. |
 |
Pic 2 of above house showing boundary walls. |
 |
Bottom of sandy lane Askam. Roughly 3 and half month to build from scratch, bungalow with attic bedrooms. |
 |
Twin peaks just off sandy lane. Total build. Roughly 3 months to build. including boundary walls around property. However we Didn't do the roof this was out to a friend. To save time. |
 |
Pic 2 of above |
 |
Askam extension done at blea beck. 2 story extension in facing brick. Also did cobble sets in driveway and rear of house. Build time 2 n half months. |
 |
Pic 2 |
 |
The crescent hawcoart barrow. Full build from plans, excluding the roof. This project took 3 months to build. |
 |
Pic 2 of the above project |
 |
Windermere avenue barrow . was a bungalow and we cut the roof off and adding second floor did roofing etc. Build time roughly 4 months. |
 |
Windermere avenue barrow . was a bungalow and we cut the roof off and adding second floor did roofing etc. Build time roughly 4 months. Picture 2 |
 |
Keswick avenue, single story in facing brick extension. Tommy from DOC builders northwest in the background. |
 |
Picture 2 of the above project. |
 |
single story garage into 2 story extension |
 |
Picture 2 |
 |
Hawcoart lane – did 2 story extension and new roof to house. |
 |
Hawcoart lane – did 2 story extension and new roof to house. Closeup |